Because of the good reputation of the corporation, financial ability and its technical staff the corporation has become qualified for many huge strategic projects such as :-
1- The corporation became qualified for implementing AL- Mukalla water losses (Financed by the German Bank of reconstruction – under the supervision of CES consulting Co. dated on 29/03/1998.
2- Qualifying the corporation for implementing the projects of technical and vocational institutes(financed by the Saudi Fund for development) on 07/11/2004.
3- Qualifying the corporation for implementing Beit AL-Fakeeh Sanitation and waste water treatment plant- Hodeida (Weimar and Trachte Company on 18/04/2005.
4-Qualifying the corporation for implementing the concrete works at Safer electricity station (gas operated)-Mareb (Parisian Co. –Iranian company) dated on 31/11/2006.
5- Qualifying the corporation for implementing the AL-Shahar city water & sanitation-Hadramawt (Financed by the German Bank of reconstruction-Consulting DORSCH) dated on 28/04/2008.
6- Selecting our corporation from within the pioneering companies list to implement the sport stadium at Zinjibar – Abyan (Khaliji 20) dated on 03/01/2009.
7- Qualifying the corporation to implement the Omani Embassy building in Sana’a on 15/6/2010.
8- Qualifying the corporation to implement the water and sanitation network-AL-Sheher city( 3 contracts) for the second time on 25/8/2010-Financed by the German Bank for reconstruction-Consulting DORSCH.
9- Qualifying the corporation to implement the 3 contracts in Sana’a Floods damages protection project financed with a loan given by Arab Fund no. 550 dated on 24/4/2011.
10- Qualifying the corporation to implement the sanitation project contracts of Seyoun & Tareem /Hadramawt on 27/3/2013 financed by the Arab Fund.
- Qualifying the corporation to implement AL-Khamseen St./14th Oct St. intersection for Shahran on 30/06/2014- Financed by the Arab Fund.
12- Qualifying the corporation to implement 60 street /Taiz St. intersection and Fourty Street / 22nd May St. intersection dated on 30/06/2014-Financed by the Arab Fund.
13- Qualifying the corporation to implement the new Ring road of Capital Sana’a on 30/06/2014-Financed by the Arab Fund.
14- Qualifying the corporation to implement 60 Street/Feg Attan St. intersection & 60 Street /AL-Rebat St. intersection on 30/6/2014 –Financed by the Arab Fund.
15- Qualifying the corporation to implement 60 Street /Wadi AL-Aanab intersection and AL-Sitteen St./AL-Nahda St. intersection on 30/06/2014 –Financed by the Arab Fund.
16- Qualifying the corporation to implement sanitation networks project -4th Phase on 18/06/2014-financed by the Arab Fund.
17- Qualifying the corporation to implement Sana’a Floods protection-Lot 6(6D) on 3/3/2015-financed by the Arab Fund.
18- Qualifying the corporation to implement Sana’a Floods protection-Lot 6(6E) on 3/3/2015-financed by the Arab Fund.